February 2017 – Sydney Desalination Plant

Inspect, test and report site’s electrical and control infrastructure, restore the plant. This includes cables and cable supports, electrical equipment, instruments, security and SCADA systems, the main high voltage switchyard and the various high voltage substations.

In 2012 Thompson Controls won a major project with Sydney Water for electrical and SCADA upgrades of numerous plants, some which are current and ongoing.

2006 – Port Kembla STP, Tubemakers – Step Screens – Design, supply and commissioning of electrical instrumentation and process control equipment

2003 – Nuplex Industries, Botany – Resin manufacture – Replacement of main switchboard

2002-2003 – Transfield Montgomery Watson Joint Venture, West Hornsby and Hornsby Heights – Waste water treatment plant STP – Electrical and Instrumentation, design, engineering, engineering, construct/installation and commissioning incl. SCADA and Controls

2002 – Mauri Foods, Harbin, China – Yeast Production – Commissioning and plant supervision

2002 – Astra Zeneca, Austin Australia – Electrical and Instrumentation, design, engineering, construct/installation, commissioning incl. PLC’s and Controls

2002 – MPI, Albright and Wilson – Leorix Filter System – Electrical and Instrumentation, design, engineering, construct/installation, commissioning

In 2002 the company offered a management buyout and it changed its name from Tryton to Thompson Controls. Then in 2010 It moved from Wetherill Park to its current facility at Eastern Creek.

2001-2002Clough Lucas Joint Venture, Bundeena Maianbar, Sydney NSW – Water and Wastewater pumping Stations – Electrical design, manufacture and installation of electrical Kiosk’s and controls